{"catalog":{"title":"AI data centers: tracker of projects announced since July 2026","path":"/ai-data-centers","updatedAt":"2026-10-05T05:03:52.729Z","fields":[{"id":"owner","label":"Owner","type":"text"},{"id":"partners","label":"Partners","type":"text"},{"id":"location","label":"Location","type":"text"},{"id":"country","label":"Country","type":"select","options":["United States","Canada","Finland","Australia","India"]},{"id":"capacityMw","label":"Announced capacity","type":"number","format":{"style":"integer","suffix":" MW"}},{"id":"capacityNote","label":"Capacity as announced","type":"text"},{"id":"chips","label":"Chips","type":"text"},{"id":"projectType","label":"Project type","type":"select","options":["Data center campus","Compute deal","Power deal","Infrastructure platform","Cloud region"]},{"id":"status","label":"Status","type":"select","options":["Announced","Under construction","Expansion","Operational","Contracted"]},{"id":"timeline","label":"Timeline","type":"text"},{"id":"announced","label":"Announced","type":"date"},{"id":"announcement","label":"Announcement","type":"url"},{"id":"checked","label":"Checked","type":"date"}]},"entries":[{"slug":"oracle-we-energies-point-beach","name":"Oracle and We Energies: Point Beach nuclear subscription for Project Lighthouse (Wisconsin)","path":"/ai-data-centers/oracle-we-energies-point-beach","category":null,"updatedAt":"2026-10-05T05:02:11.628Z","fields":{"owner":"Oracle","partners":"We Energies","location":"Point Beach Nuclear Plant; Project Lighthouse, Port Washington, Wisconsin","country":"United States","capacityMw":null,"capacityNote":"Subscription to a portion of the Point Beach purchase power arrangement; Oracle names no MW figure","chips":null,"projectType":"Power deal","status":"Announced","timeline":"Subject to approval by the Public Service Commission of Wisconsin","announced":"2026-10-02","announcement":"https://www.oracle.com/news/announcement/oracle-announces-commitment-to-absorb-rising-point-beach-energy-costs-2026-10-02/","checked":"2026-10-05"}},{"slug":"jera-rhaelm-dell-chiba","name":"JERA, RHAELM and Dell: Chiba AI data center (Japan)","path":"/ai-data-centers/jera-rhaelm-dell-chiba","category":null,"updatedAt":"2026-10-05T05:01:37.475Z","fields":{"owner":"JERA, RHAELM","partners":"Dell Technologies (Dell AI Factory), Apollo Global Management (intended investment and financing partner for RHAELM)","location":"Chiba Thermal Power Station, Chiba, Japan","country":null,"capacityMw":400,"capacityNote":"Supported by power capacity of up to 400 MW; total capital deployment expected to exceed US$15 billion","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Operations targeted to begin around 2028","announced":"2026-10-01","announcement":"https://www.jera.co.jp/en/news/information/20261001_2535","checked":"2026-10-05"}},{"slug":"aib-nebius-50mw","name":"AIB Data Centers and Nebius: 50 MW lease (Southeastern US)","path":"/ai-data-centers/aib-nebius-50mw","category":null,"updatedAt":"2026-10-02T12:06:55.472Z","fields":{"owner":"AIB Data Centers","partners":"Nebius (tenant)","location":"Southeastern United States","country":"United States","capacityMw":50,"capacityNote":"50 MW of critical IT capacity in two data halls","chips":null,"projectType":"Compute deal","status":"Contracted","timeline":"12-year initial term with optional renewals","announced":"2026-09-30","announcement":"https://www.globenewswire.com/news-release/2026/09/30/3371855/0/en/aib-data-centers-signs-contract-with-nebius-for-ai-data-center-capacity.html","checked":"2026-10-02"}},{"slug":"constellation-amazon-calvert-cliffs","name":"Constellation and Amazon: Calvert Cliffs PPA (Maryland)","path":"/ai-data-centers/constellation-amazon-calvert-cliffs","category":null,"updatedAt":"2026-10-05T05:03:16.298Z","fields":{"owner":"Amazon","partners":"Constellation Energy","location":"Calvert Cliffs, Lusby, Maryland","country":"United States","capacityMw":690,"capacityNote":"690 MW incl. about 190 MW uprate online 2030–2032","chips":null,"projectType":"Power deal","status":"Contracted","timeline":"20-year PPA; uprate capacity online 2030–2032","announced":"2026-09-30","announcement":"https://www.constellationenergy.com/news/2026/09/constellation-and-amazon-announce-20-year-power-purchase-agreement-at-calvert-cliffs.html","checked":"2026-10-05"}},{"slug":"microsoft-india-south-central-hyderabad","name":"Microsoft India South Central cloud region (Hyderabad)","path":"/ai-data-centers/microsoft-india-south-central-hyderabad","category":null,"updatedAt":"2026-10-05T05:03:38.118Z","fields":{"owner":"Microsoft","partners":null,"location":"Hyderabad","country":"India","capacityMw":null,"capacityNote":"Three availability zones","chips":null,"projectType":"Cloud region","status":"Operational","timeline":"Live September 2026; more AI services rolling out","announced":"2026-09-21","announcement":"https://news.microsoft.com/source/asia/2026/09/21/ai-ambition-into-action-microsoft-brings-ai-ready-capabilities-across-its-india-cloud-infrastructure-establishes-india-south-central-region-as-a-strategic-hub-for-asia-and-global-south/","checked":"2026-10-05"}},{"slug":"coreweave-contracted-power-4-2-gw","name":"CoreWeave contracted power: about 4.2 GW","path":"/ai-data-centers/coreweave-contracted-power-4-2-gw","category":null,"updatedAt":"2026-10-02T12:08:59.573Z","fields":{"owner":"CoreWeave","partners":null,"location":null,"country":null,"capacityMw":4200,"capacityNote":"About 4.2 GW contracted power as of Aug 11, 2026 (3.7 GW at June 30)","chips":null,"projectType":"Infrastructure platform","status":"Contracted","timeline":"Contracted power as of August 11, 2026","announced":"2026-09-17","announcement":"https://investors.coreweave.com/news/news-details/2026/CoreWeave-Continues-to-Contract-New-Compute-Capacity-at-Higher-Prices/default.aspx","checked":"2026-10-02"}},{"slug":"oracle-q1-fy27-capacity","name":"Oracle Q1 FY27: 850 MW of datacenter capacity delivered","path":"/ai-data-centers/oracle-q1-fy27-capacity","category":null,"updatedAt":"2026-10-05T05:03:45.523Z","fields":{"owner":"Oracle","partners":null,"location":null,"country":null,"capacityMw":850,"capacityNote":"850 MW additional datacenter capacity delivered in Q1 FY27; 300,000+ GPUs delivered","chips":null,"projectType":"Infrastructure platform","status":"Operational","timeline":"Delivered in fiscal Q1 2027","announced":"2026-09-10","announcement":"https://www.oracle.com/news/announcement/q1fy27-earnings-release-2026-09-10/","checked":"2026-10-05"}},{"slug":"nvidia-australia-2gw","name":"NVIDIA and Australian data-center partners: up to 2 GW","path":"/ai-data-centers/nvidia-australia-2gw","category":null,"updatedAt":"2026-10-05T05:03:42.156Z","fields":{"owner":"NVIDIA","partners":"Firmus, Sharon AI, IREN, Megaport, ResetData, CDC, NEXTDC, AirTrunk","location":"Australia (multiple sites, incl. IREN Bundey campus, South Australia)","country":"Australia","capacityMw":2000,"capacityNote":"Up to 2 GW buildout across partners by 2027","chips":"NVIDIA GPUs; DSX AI factories, Quantum InfiniBand, Spectrum-X","projectType":"Infrastructure platform","status":"Announced","timeline":"Up to 2 GW by 2027","announced":"2026-09-09","announcement":"https://nvidianews.nvidia.com/news/nvidia-expands-ai-infrastructure-capacity-in-partnership-with-australias-data-center-ecosystem","checked":"2026-10-05"}},{"slug":"figure-nscale-vera-rubin","name":"Figure and Nscale: up to 100,000 Vera Rubin GPUs (Texas)","path":"/ai-data-centers/figure-nscale-vera-rubin","category":null,"updatedAt":"2026-10-05T05:03:27.641Z","fields":{"owner":"Figure","partners":"Nscale","location":"Barstow, Texas","country":"United States","capacityMw":null,"capacityNote":"Up to 100,000 GPUs; $3.5 billion initial commitment","chips":"NVIDIA Vera Rubin","projectType":"Compute deal","status":"Contracted","timeline":"Initial deployment from H2 2027","announced":"2026-09-03","announcement":"https://www.figure.ai/news/figure-and-nscale-sign-strategic-partnership","checked":"2026-10-05"}},{"slug":"openai-ports-pike-ohio","name":"OpenAI PORTS-Pike, Pike County (Ohio)","path":"/ai-data-centers/openai-ports-pike-ohio","category":null,"updatedAt":"2026-10-02T12:09:44.662Z","fields":{"owner":"OpenAI","partners":"SB Energy, NVIDIA, U.S. Department of Energy","location":"Pike County, Ohio (former Portsmouth Gaseous Diffusion Plant)","country":"United States","capacityMw":8000,"capacityNote":"About 8 GW-IT planned; first 800 MW in 2028","chips":"NVIDIA AI compute (exclusively)","projectType":"Data center campus","status":"Announced","timeline":"First 800 MW in 2028; six-year buildout through 2032","announced":"2026-08-17","announcement":"https://openai.com/index/openai-joins-ports-pike-project/","checked":"2026-10-02"}},{"slug":"theseus-infrastructure-anthropic-macquarie-gic","name":"Theseus Infrastructure (Anthropic, Macquarie Asset Management, GIC)","path":"/ai-data-centers/theseus-infrastructure-anthropic-macquarie-gic","category":null,"updatedAt":"2026-10-05T05:03:52.729Z","fields":{"owner":"Macquarie Asset Management, GIC","partners":"Anthropic (anchor tenant)","location":"United States (initial focus)","country":"United States","capacityMw":null,"capacityNote":null,"chips":null,"projectType":"Infrastructure platform","status":"Announced","timeline":null,"announced":"2026-08-10","announcement":"https://www.macquarie.com/au/en/about/news/2026/anthropic-mam-gic-data-centre-infrastructure-partnership.html","checked":"2026-10-05"}},{"slug":"crusoe-aalo-atomics-idaho","name":"Crusoe and Aalo Atomics nuclear-powered data center (Idaho)","path":"/ai-data-centers/crusoe-aalo-atomics-idaho","category":null,"updatedAt":"2026-10-05T05:03:20.707Z","fields":{"owner":"Crusoe","partners":"Aalo Atomics","location":"Idaho National Laboratory, Idaho","country":"United States","capacityMw":10,"capacityNote":"Aalo-X reactor, 10 MWe; 50 MWe Aalo XMR plants planned","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Proof of concept at INL in 2027; XMR plants at Crusoe sites by end of 2029","announced":"2026-07-30","announcement":"https://www.crusoe.ai/resources/newsroom/crusoe-and-aalo-atomics-form-strategic-partnership-with-goal-of-deploying-first-nuclear-powered-ai-factory","checked":"2026-10-05"}},{"slug":"brookfield-nextera-paducah-kentucky","name":"Brookfield and NextEra Paducah campus (Kentucky)","path":"/ai-data-centers/brookfield-nextera-paducah-kentucky","category":null,"updatedAt":"2026-10-05T05:03:12.497Z","fields":{"owner":"Brookfield, NextEra Energy","partners":"U.S. Department of Energy (site), Big Rivers Electric, Jackson Purchase Energy Cooperative, Paducah Power System","location":"DOE Paducah Site, western Kentucky","country":"United States","capacityMw":1200,"capacityNote":"Over 1.2 GW of compute capacity; up to 4.6 GW of dedicated generation","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Construction complete by 2032; subject to definitive agreements","announced":"2026-07-29","announcement":"https://newsroom.nexteraenergy.com/2026-07-29-DOE-Site-in-Western-Kentucky-Revitalized-with-Data-Center-Campus-and-Dedicated-Energy-Project,-Creating-Jobs-and-Protecting-Residents-and-Businesses-from-Costs","checked":"2026-10-05"}},{"slug":"amd-anthropic-mi450","name":"AMD and Anthropic: up to 2 GW of Instinct MI450 GPUs","path":"/ai-data-centers/amd-anthropic-mi450","category":null,"updatedAt":"2026-10-05T05:03:08.268Z","fields":{"owner":"Anthropic","partners":"AMD","location":null,"country":null,"capacityMw":2000,"capacityNote":"Up to 2 GW of AMD Instinct MI450 Series GPUs; first gigawatt from H1 2027","chips":"AMD Instinct MI450 Series (MI455X) in Helios racks; EPYC Venice CPUs","projectType":"Compute deal","status":"Contracted","timeline":"First gigawatt deployment begins H1 2027","announced":"2026-07-22","announcement":"https://ir.amd.com/news-events/press-releases/detail/1292/amd-and-anthropic-announce-strategic-partnership-to-deploy-up-to-2-gigawatts-of-amd-instinct-mi450-series-gpus","checked":"2026-10-05"}},{"slug":"openai-effingham-county-georgia","name":"OpenAI Project Camellia, Effingham County (Georgia)","path":"/ai-data-centers/openai-effingham-county-georgia","category":null,"updatedAt":"2026-10-02T12:38:49.680Z","fields":{"owner":"OpenAI","partners":"Georgia Power","location":"Effingham County, Georgia","country":"United States","capacityMw":3200,"capacityNote":"3.2 GW of power, delivered in phases","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Power delivery in phases between 2028 and 2032","announced":"2026-07-22","announcement":"https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/","checked":"2026-10-02"}},{"slug":"crusoe-lancium-childress-texas","name":"Crusoe and Lancium Childress campus (Texas)","path":"/ai-data-centers/crusoe-lancium-childress-texas","category":null,"updatedAt":"2026-10-05T05:03:24.101Z","fields":{"owner":"Crusoe, Lancium","partners":"Lancium (land, power, energy management); Crusoe (design, build, operation)","location":"Childress, Texas","country":"United States","capacityMw":1000,"capacityNote":"1.0 GW campus","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Construction expected to start Q3 2026","announced":"2026-07-15","announcement":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","checked":"2026-10-05"}},{"slug":"pure-dc-seinajoki-finland","name":"Pure DC Seinäjoki AI campus (Finland)","path":"/ai-data-centers/pure-dc-seinajoki-finland","category":null,"updatedAt":"2026-10-05T05:03:49.346Z","fields":{"owner":"Pure Data Centres Group","partners":"SDC Ventures","location":"Seinäjoki","country":"Finland","capacityMw":110,"capacityNote":"Phase 1: 110 MW (fully leased); full campus 550 MW+ subject to permissions","chips":null,"projectType":"Data center campus","status":"Announced","timeline":"Phase 1 fully leased, first data hall substation live; decade-long build","announced":"2026-07-14","announcement":"https://puredc.com/2026/07/14/pure-dc-launches-one-of-europes-largest-ever-ai-infrastructure-projects","checked":"2026-10-05"}},{"slug":"meta-richland-parish-louisiana","name":"Meta Richland Parish data center expansion (Louisiana)","path":"/ai-data-centers/meta-richland-parish-louisiana","category":null,"updatedAt":"2026-10-05T05:03:31.364Z","fields":{"owner":"Meta","partners":"Entergy Louisiana","location":"Richland Parish, Louisiana","country":"United States","capacityMw":5000,"capacityNote":"Expanding to 5 GW of compute capacity; more than $50 billion invested in the region","chips":null,"projectType":"Data center campus","status":"Expansion","timeline":"Ground broken December 2024; expansion announced July 2026","announced":"2026-07-13","announcement":"https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/","checked":"2026-10-05"}},{"slug":"meta-sturgeon-county-alberta","name":"Meta Sturgeon County data center (Alberta)","path":"/ai-data-centers/meta-sturgeon-county-alberta","category":null,"updatedAt":"2026-10-05T05:03:34.277Z","fields":{"owner":"Meta","partners":"Greenlight Limited Partnership, AltaLink, Alberta Electric System Operator (energy planning)","location":"Sturgeon County, Alberta","country":"Canada","capacityMw":1000,"capacityNote":"1 GW AI-optimized data center; more than CA$13 billion investment","chips":null,"projectType":"Data center campus","status":"Under construction","timeline":"Ground broken July 2026","announced":"2026-07-08","announcement":"https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/","checked":"2026-10-05"}}]}